Forum
    • Categories
    • Register
    • Login

    How to Change Order of the Stacked Effects

    Scheduled Pinned Locked Moved General Questions
    26 Posts 11 Posters 6.5k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • DabDabD
      DabDab
      last edited by

      How can I change order of effects?.. Something like this....

      Order Stack.gif

      Bollywood Music Producer and Trance Producer.

      NatanN 1 Reply Last reply Reply Quote 0
      • NatanN
        Natan @DabDab
        last edited by

        @DabDab We Had Discussion About Reordering Fx Units Here:
        https://forum.hise.audio/topic/3681/anyone-done-a-rerdering-fx/14

        It's A Hard Task To Get Done.
        And Needs Lots Of Works That Only Can be Done By Our Expert Senior Programmers 👏

        And Here You Can See How It Loos Like:
        https://forum.hise.audio/topic/3818/change-order-of-childcomponents-inside-panel/19

        UD AUDIOU DabDabD 2 Replies Last reply Reply Quote 1
        • UD AUDIOU
          UD AUDIO @Natan
          last edited by

          @Natan So I need to become a senior programmer too :D
          I thought that ScriptNode would be easier for reordering FX.

          ustkU 1 Reply Last reply Reply Quote 1
          • DabDabD
            DabDab @Natan
            last edited by

            @Natan @thank you.. but I need FX order should change (e.g Delay after Reverb sounds different than Reverb After Compressor) as soon as I change the FX panels.. Is this possible?

            Bollywood Music Producer and Trance Producer.

            MikeBM NatanN 2 Replies Last reply Reply Quote 0
            • MikeBM
              MikeB @DabDab
              last edited by

              @DabDab

              You can also possibly take up Lindon's idea and select the effects via ComboBox in slots - it's the same but without drag&drop.

              https://forum.hise.audio/topic/3681/anyone-done-a-rerdering-fx/6

              "One hour of trial and error can save 10 minutes of reading the manual."
              "It's easier to hit the developer with feature requests than to spend 10 minutes reading the manual. :-)))"
              HISE Develop - Mac Pro 5.1, OS X 10.14.6, Projucer 6.02, Xcode 10.3

              DabDabD 1 Reply Last reply Reply Quote 2
              • ustkU
                ustk @UD AUDIO
                last edited by

                @UD-AUDIO Scriptnode has nothing to do with this, it's more a modular DSP environment.

                @DabDab On the interface, you'll need to master the panel painting/mouse callback (so all in one panel). But it might be doable with simple dragging panels though (one panel per effect), but I never tried...

                On the FX side, you'll need to use the "Effect Slot" FX so you can swap FXs at runtime using the "SlotFX" API.
                It should also be possible in Scriptnode with some basic routing and send/receive nodes.

                Hise made me an F5 dude, any other app just suffers...

                Christoph HartC 1 Reply Last reply Reply Quote 2
                • NatanN
                  Natan @DabDab
                  last edited by

                  @DabDab So Make 2 Chains.

                  Delay > Reverb
                  Reverb > Delay

                  Simply Bypass / First One Using A Button, And Enable Second Chain.
                  Also To Make It More User Friendly, Just Move The Graphics Around By Adding Some X,Y Positioning.

                  Kinda Cheating, But It Works 👋

                  DabDabD 1 Reply Last reply Reply Quote 1
                  • Christoph HartC
                    Christoph Hart @ustk
                    last edited by

                    @ustk said in How to Change Order of the Stacked Effects:

                    Scriptnode has nothing to do with this, it's more a modular DSP environment.

                    Actually it is a bit more convenient to implement a dynamic signal chain that can be scripted using scriptnode.

                    // Create a DSP Network
                    const var dsp = Engine.createDspNetwork("dsp") ;
                    
                    // Create a list of all effects that you want to assign
                    const var fx = [dsp.get("reverb"), dsp.get("delay")];
                    
                    // Create the ID list for the slots 
                    // (they are just simple containers but it helps avoiding
                    // fiddling with the indexes)
                    const var slots = ["slot1", "slot2"];
                    
                    
                    // This function will take an array with slot indexes
                    // and move them into the slots defined above
                    inline function setOrder(order)
                    {
                        local i = 0;
                        
                        for(i = 0; i < order.length; i++)
                        {   
                            local idx = order[i];
                            fx[i].setParent(slots[idx], 0);
                        }
                    }
                    
                    
                    // Use -1 to remove the effect (not assign it to anything)
                    setOrder([-1, -1]);
                    
                    setOrder([0, -1]);
                    
                    setOrder([1, 0]);
                    

                    Now all you need to do is to implement a dragging UI using script panels and then call setOrder with the updated index array (this is rather a tedious task but you would have to implement it anyway).

                    ? OrvillainO 2 Replies Last reply Reply Quote 7
                    • DabDabD
                      DabDab @Natan
                      last edited by

                      @Natan I like the idea... I have a lower knowledge of HISE. So I need your help. I will post the project tomorrow along with your idea. I need some corrections.

                      Bollywood Music Producer and Trance Producer.

                      1 Reply Last reply Reply Quote 0
                      • DabDabD
                        DabDab @MikeB
                        last edited by

                        @MikeB Yup.. :)

                        Bollywood Music Producer and Trance Producer.

                        1 Reply Last reply Reply Quote 0
                        • UD AUDIOU
                          UD AUDIO
                          last edited by UD AUDIO

                          Drag&drop swapping for comboboxes would be insane :D
                          (FL Studio mixer does work similar to this)
                          99 problems but f-x ain't one!

                          1 Reply Last reply Reply Quote 0
                          • DabDabD
                            DabDab
                            last edited by

                            Hi, @ustk @ulrik @Natan @MikeB
                            How can I change FX Order stack from Interface and via DSP.

                            HiseSnippet 955.3oc4W8zabSDEebxNzraJnVTkfi6wToRk2lT.INraR1rvpl+XkMT5sxD6miGE6YL1iaYEh67UH23iBR7Qnm3FRHwY9F.uw1q83F2nvJHUH7I+98duwu+7adyXmDoKjlJSHVcOYdLPrtMc1bgJX2.FWPlNlX8dzCXoJHoeAzNyiYoofGwxZ0OWCX0sCI+4OFtCKjIbgZHB4oRtKrOOhqpQcF8DdX3DlGbBOxv5sFM0UJ1UFJyv3YUpMIl4dN6L3Pl1rUnDq2YOOtRlLSwTPJZyNRu4yBjuTTX+S4o7SCAsv.xLbgJfI6FvC8bVjqoDhUGm5Le0hL+dzC3d7J75JvcxUzu1CyZf0JMCoNMBoAuoPZhLzSu.ugvyxH75TDd2kNyMgGqp0nis0oSEXywmgkcyvpvVh0OQ2UhFHTOLhcNLIAEpbXiGaa+f9aYae+OyOS3p3RQeo3PoBNRrw868c8516660+0U462pN8mIQFFBIspV2oStJG2PjEcJj7f9ufElAUFhoey565Wu5qaQVaXnTLUvUGECkx0c.sthrdgVaRUxZBUmiln4oVKlUCc4FLorqfu8kSGyTLcOuDCsKFRTbc1ZMFdAtApfAzkNFROWIiwsPWhdfjToWVHS0j4p2hVp.K2MnHZdfHkqlatE9uAc1tU57f1x1qY3dWpCW4Fzd7tRKwKV092NdKGN7tz878AWUcv1gN4Y2.SBLGTsdQrbKjGDxlmGEqU79fFQRNjlVtO3aL28CGUo3X9YAFZt2nI.3cJNs0viQat4qFt.2zgbE6KeoC9Amj.eS057CuZzWvuDJY7nC3eas3uN7DHJVhGy31f4s5UMaev0e1N4XYlhKN6.lJQ+coGlEMCORwEvlmP.g3hSsVQuIrP1VKqChYfvKW3OwmRkCzxVkJGrPoICYsE6NyOlCJlK2agTyNyIAIPZPcc72FdTlJNSYhbLDBrTvrfssRg8fZi94gOQ.Kr3Gu3he4+tUuasn54DfIMtkp3Tsbo9SdVyxmlWkABWjuWUclOpB8Q0nWTwnKw9Ze+eeXCd3+fTt1Nut0IbueYh81ej7am175zYLUVhtnjWOtcsbyNcIrt.YLs+q.01QxLgxr93j.MuHJN+Vlpdcra9l8GPqyh+mzwuI9FQL2D4ycKtjkterVNBl2h7+SnK9CKnb+Aj7qRh9QsenMIBuC+ycc0Gb+QX8ocedzR3ylKgOasD973kvmOdI74SVBe9zqzG8uOsclRFUv+Q.m8xuzqk0dBFxjy2JP9K..R92xC
                            

                            Bollywood Music Producer and Trance Producer.

                            1 Reply Last reply Reply Quote 0
                            • Tania GhoshT
                              Tania Ghosh
                              last edited by Tania Ghosh

                              Hi....Snippet is not openning

                              Tania Ghosh

                              1 Reply Last reply Reply Quote 0
                              • DabDabD
                                DabDab
                                last edited by

                                @Natan @ustk @MikeB @ I have done FX Slot Reorder via comboBox and FXSlot . Now my problem is You to change order Of Panel?

                                FXOrder.jpg
                                I can understand dynamically it is impossible to make stunning Animated Things, like Serum/Vital does. Till now can anybody tell me how to change order of panel? Something virtual to make End user believe . I hope this will be my only solution for now.
                                I hope HISE developer @Christoph-Hart will implement this features in future.

                                Bollywood Music Producer and Trance Producer.

                                ustkU 1 Reply Last reply Reply Quote 0
                                • ustkU
                                  ustk @DabDab
                                  last edited by ustk

                                  @DabDab Well, if you use comboboxes, this means an effect type can be select multiple times unless you added some safety. So moving panel isn't the solution, because this is more apparently related to effect selection than effect reordering... This would mean all panels have to exist prior to being called. If you have 5 effect types with 3 slots, this is 15 panels... imagine if you have more effects and/or slots...

                                  Dynamic reordering is absolutely doable, but this requires some learnings on how to manipulate panels (or child panels). And this is not combobox friendly as they don't suggest re-ording by nature, but straight selection.
                                  If you don't want to reorder but just call the good panel (like your screenshot suggests), then instead of creating 15 panels like mentioned above, a panel factory would be much better. But again, this requires some learning about panels and how to make a factory, as well as child panels. because child panels can be dynamic, not straight panels from a factory (they can be created but not deleted like child panels)

                                  Seeing all of this it's hard to tell you how because it depends on the behaviour that you want and the skill level. In any case, you'll need to learn a lot about panel manipulation and/or how to make a factory using child panels, as no easy or ready solution will come to you (at least none I can think of to replace 15 or more panels, which is absolutely not a good start). I strongly advise you to learn everything about panel recipes in the doc, this will keep you busy for a while:

                                  https://docs.hise.audio/tutorials/recipes/ui/scriptpanel.html#horizontal-list-example

                                  go step by step, create one child panel using a button first, then a combobox for two children, and add difficulty step by step.

                                  It is not necessary to think effects like a list though. Each of the 3 panels above can have its own list of 1 panel ;)
                                  Just make a child factory per effect type, and call it when and where you need it. I must say I've never done it this way for effects reordering.

                                  Hise made me an F5 dude, any other app just suffers...

                                  LindonL DabDabD 2 Replies Last reply Reply Quote 1
                                  • LindonL
                                    Lindon @ustk
                                    last edited by Lindon

                                    @ustk said in How to Change Order of the Stacked Effects:

                                    (at least none I can think of to replace 15 or more panels, which is absolutely not a good start).

                                    Why? It works like a dream for me...as you can see in the example I posted 5 slots with 7 FX in each = 35 panels, works fine, no CPU or graphics overload....

                                    HISE Development for hire.
                                    www.channelrobot.com

                                    ustkU 1 Reply Last reply Reply Quote 0
                                    • ustkU
                                      ustk @Lindon
                                      last edited by

                                      @Lindon For two reasons:
                                      It's good you don't have graphic overloads because I had some in the first tests I've made long ago. So I would be afraid to get glitchy graphics on some user smaller systems...
                                      But the main reason (if the graphic load is ok) is the maintenance and the UI list growing exponentially, requiring huge component declarations.
                                      I don't say it doesn't work or it is bad, but I prefer dynamic stuff with only one panel and some factory. The only issue with child panels is the impossibility of inserting something else than a panel. So knobs have to be panels too...

                                      Hise made me an F5 dude, any other app just suffers...

                                      1 Reply Last reply Reply Quote 0
                                      • DabDabD
                                        DabDab @ustk
                                        last edited by

                                        @ustk Ok... Thank you :)

                                        Bollywood Music Producer and Trance Producer.

                                        1 Reply Last reply Reply Quote 0
                                        • ?
                                          A Former User @Christoph Hart
                                          last edited by

                                          @Christoph-Hart This is really interesting!! I think I'll try this one! But what I don't quite get yet is the dsp.get("reverb") for example. So the reverb is a container in your DspNetwork? Or wrapped ones?

                                          1 Reply Last reply Reply Quote 0
                                          • OrvillainO
                                            Orvillain @Christoph Hart
                                            last edited by

                                            @Christoph-Hart said in How to Change Order of the Stacked Effects:

                                            @ustk said in How to Change Order of the Stacked Effects:

                                            Scriptnode has nothing to do with this, it's more a modular DSP environment.

                                            Actually it is a bit more convenient to implement a dynamic signal chain that can be scripted using scriptnode.

                                            // Create a DSP Network
                                            const var dsp = Engine.createDspNetwork("dsp") ;
                                            
                                            // Create a list of all effects that you want to assign
                                            const var fx = [dsp.get("reverb"), dsp.get("delay")];
                                            
                                            // Create the ID list for the slots 
                                            // (they are just simple containers but it helps avoiding
                                            // fiddling with the indexes)
                                            const var slots = ["slot1", "slot2"];
                                            
                                            
                                            // This function will take an array with slot indexes
                                            // and move them into the slots defined above
                                            inline function setOrder(order)
                                            {
                                                local i = 0;
                                                
                                                for(i = 0; i < order.length; i++)
                                                {   
                                                    local idx = order[i];
                                                    fx[i].setParent(slots[idx], 0);
                                                }
                                            }
                                            
                                            
                                            // Use -1 to remove the effect (not assign it to anything)
                                            setOrder([-1, -1]);
                                            
                                            setOrder([0, -1]);
                                            
                                            setOrder([1, 0]);
                                            

                                            Now all you need to do is to implement a dragging UI using script panels and then call setOrder with the updated index array (this is rather a tedious task but you would have to implement it anyway).

                                            Hey Chris, is this the right approach in 2025?

                                            I was thinking I'd add slotFX instances, and then write a callback to update each slot with the specified network name. But which is better or more future proof?

                                            Musician - Instrument Designer - Sonic Architect - Creative Product Owner
                                            Crafting sound at every level. From strings to signal paths, samples to systems.

                                            HISEnbergH 1 Reply Last reply Reply Quote 0
                                            • First post
                                              Last post

                                            11

                                            Online

                                            3.1k

                                            Users

                                            14.0k

                                            Topics

                                            122.1k

                                            Posts