Forum
    • Categories
    • Register
    • Login

    Change order of childComponents inside panel?

    Scheduled Pinned Locked Moved Scripting
    41 Posts 6 Posters 10.9k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • LindonL
      Lindon @ulrik
      last edited by

      @ulrik said in Change order of childComponents inside panel?:

      @Lindon Haha...no problem

      I'm sure you wont, but dont forget to escape the quotes....

      HISE Development for hire.
      www.channelrobot.com

      1 Reply Last reply Reply Quote 1
      • Christoph HartC
        Christoph Hart
        last edited by

        Don't. The order of the UI elements will be used in the preset storage, also the UI element hierarchy is not supposed to be changed (actually I'm not even sure if you can change the parentComponent property after onInit.

        If you need dynamic UI elements, consider using the ScriptPanel.addChildPanel() method which can be used to dynamically create (and delete) ScriptPanels inside another Panel (they won't show up in the UI component tree and are only accessible by scripting).

        Take a look at this example for how to use this feature:

        https://docs.hise.audio/tutorials/recipes/ui/scriptpanel.html#horizontal-list-example

        ulrikU 2 Replies Last reply Reply Quote 2
        • ulrikU
          ulrik @Christoph Hart
          last edited by

          @Christoph-Hart thank you Christoph, I'll take a look :)

          Hise Develop branch
          MacOs 15.6.1, Xcode 16.2
          http://musikboden.se

          1 Reply Last reply Reply Quote 0
          • ulrikU
            ulrik @Christoph Hart
            last edited by

            @Christoph-Hart This is fantastic, this solves my reorder problems. I didn't know this was available in Hise, I get surprised all the time :)
            Thank you!

            Hise Develop branch
            MacOs 15.6.1, Xcode 16.2
            http://musikboden.se

            1 Reply Last reply Reply Quote 0
            • Christoph HartC
              Christoph Hart
              last edited by

              Yes I kind of sneaked that one in a few months ago, mostly because of the necessity of displaying pending downloads & expansions.

              ulrikU 1 Reply Last reply Reply Quote 1
              • ulrikU
                ulrik @Christoph Hart
                last edited by

                @Christoph-Hart how do you set the z depth for the childPanels?
                It doesn't seem to follow the index order in the childPanel array.

                The latest created child should be on top of all, that's working, however if I changed the order inside the childPanels array, it doesn't change the z-depth.

                Is it possible to change it?
                childpanels.gif

                Hise Develop branch
                MacOs 15.6.1, Xcode 16.2
                http://musikboden.se

                ulrikU 1 Reply Last reply Reply Quote 0
                • ulrikU
                  ulrik @ulrik
                  last edited by

                  @ulrik example snippet

                  HiseSnippet 2655.3ocuZstbaiaElJIzI1Yc6lN8O8en5GYnpUTjbbtrMMasrjbVMqrrpkr6EOotzjPRnghTKIjkU20yryz7f0Gk9Hz2fsG.dAf2jjcmTlLVCANGfO7ctfCHYOWGCrmmiqRgMGrXJVovWn1egMcbiw5Dak1MUJrsZiwDKyd51XKOkCVLU2yCapTnv8eOSjBa9.E90+42eftktsAVzjhxYNDCbGxDBUzZu8+Vhk0g5l3AjIRRu29sMbra3X4LCfy8UqpLU23i5ivc0YhcOUkBazxjPcb6S0oXOkBO3.GyE8G6L21W9yHdjKsvrapozGFH+lOzwxjgXVqJ9KlvksmBLJ8Djv88Igeo5QDSRT6Bx3K4cfDZHyGEt2xfWMY3Uc8gWAI38.e38D09FtjoTQOLr8X011Tr6PcvDHCKeYUt2+7Wo1vAjvlVYh9GwG5B2Dog1qpVsL5kUqV5sauEXF7nnqzcQ8514hFG2cP81cacB5cnvAXDl1vYxTGa3FshwjpX7QneqAcqeTqb0Mn+DZcVubU3rdbYY+64OGg5ioHK8EXWjM3lr8VDaKhMFMblsAk3XibrClA1n45XoYDNTkgYxZFtz1a88auEBtrbLzs3CCL479dqbGDyqg1OqGCOmw5UqTP+AyPEOLfuq7sxEKiFpa4gCkwfYX6P7nmCiyGRJJ0c1RkjhulBhwvVNh4hmBNoT.S7d2dqa3jzJHc1nGPLMzsrtDB3zRxXgrc.eCN3XDHqO.lxSK3yVdrI9Ywuh4JL33Sp+9k3J32ef4kMYuGLthoA4Q9G3jSPtSV6+xRlInSooI60DwFoir.BFsNyWj4.lzy+PzPW2zDYimKuJV1J3YY4.WuYyU67RFhzBahcePyB2WNB.vEKXshtooH8N2gdyHmqXtdE6vCxJh1QrTqXgsGQGmkV.Y5LOzkxioecfdEMDoSvO9XzCvGXo5C1YsjRDKHaNwjNFFUuJyyZ1WQ2iwjQio79y.78XwQm3LiBlAsdmjVfibl4giBWNpwAwEgyLDaOrKUCxoxaKRBGWSrKmwEKvgNtHMCl+Vj9kDVOICIeJpXpS0qP75isvFTLyjxSz71jxkHi.65lj377peHiwikMJDbP9Nuv7cUCy8vFmkmgA7YyK6hvcVDAd7IMg8WZ7Ms6zrW8ts5zGcqCSjH1nfBVfoGTEAKg9dAXWNkdR+MQOigd.uiLzYAzS0f14VNBuADA86REY.styNoCHkRcGjeeA3LtnjjIbAZm2AfXGe3Knc1Owifi6QmDAneCRKZXJwlgaD4xOokDu2oc+A2ZV2EK3c1rpA6EUFoOwYlMM4FqVRIGkLAy0m1luyJa+0cBzMFume7gbRN1Zd5LuwZFkhSWI1tDhKl3bEVyJbqyTanFF7F.sxnThFr.XxZXg0c0Jc6ALDC34XgqL0kEjZvheBR1VJ0BPxl0rUmVCZIEpb6iTr8GiK5C+zXPqUr4xlqbmk7KLJ85DjUtyTEwvLMPkoS5o6h44txP1PKXbkkEMQV1vlyZdWVBvLkVjVUHPhjjgFukkfLgMHujkYapDkj46TzCREL3jiOc.jQ.sBGhjEtziUWuVn2g1n3YOulktiNl3k135+2QLbenCaIYhGpOyhkEpVzNEipLDNrGr2ul+A67pbIjpBmwX32ejXyIzw0slNVWnnEPIkQUq75RhQ2zUe9.HnQKDigwPkQmCa9tW4Hv+GY0DnAsWauDww4CB9TFexZYYQl5g0N+5Ef2PYffNuF7yqf+C+raViLK.hihDNZoimxBCtXSYWMeTbBL.ZrEX0LVfgM7M7MEzJA3plTJkajO9zQGeZ+VMp2oyA0a7s2ROGnxmXtN3qvxY8COclWvxUPFbAgLmDiOJXgXwmg5xpIelc7Q3+6kLkN8ACdfkBUjQ0EQTGTZHlkEOcpkziISOdJUXTgiAyy7lclF4MrLwWe7PtWVIQ9GwDD6jx9GTNSiA5oOE42vBnblZ6l1EMmy5Je.1ThwptQDetPrAWJICNrQxfYY448srSZyt7Xmnik0IjLdax.xbW1eclKaIqIe2tb392lkFKjk+7XizGhnjL8IVmGrv54qsJB3G9g.B.xtLhQG+Z+a8FSFRa5L2NGJIxY7be4gpkBHxOjBfYsyojgZ4.MBHBaECpKq35DLcbWw.KyNRi0eNaif.CSXG76zo4mogkUr6oG0jwguCcjNcbEWnbVSMoIA8bI26f51i4fytRUWcr0R4vIIoZ4T2yMwJmLFkGayf22Zf+yM4vS61XP6i6tzMDRWYYzQoRT4O6XVrwUNjth2TKBbGpX7CdMGjcptqGtM3o3Aawl9bYRcuaxRx4B4b4eG8tTNFEmW72hlWVpgwPCiyxsyESm4ZyFm3GXR7fhfcdBebVKijRyQB1OAIAI5kOcz5cnmjK2L7IKxR2CKzXmvnbBYX0TPrGEJVPgdRdPYFY.P1+HW.Bx7PWATjHKAnQhyf1432Gwjqr1izGkAT+h.0+e5YjE+TJTW1iDOD8BBoz5+.Pj.Vd01mF6xAiM5zp9IHnxr0nprLoF9.bAL.qlXVKmMi7OdFiND6HJNR7lIebWobH3GTXY7XzpHOVL4xjMfRrPWGJ9XasRa88as4V2rEJYWCGlYeAClE1MytYu4J2konl8rIWhcCY5PAUJ7f3uiH07eGQxuBKCetQRPG611D5wSw148liTBHTEkBaDfJPTJ+MH8KBdCRXyyH34ScboJDS.bpm0SgiX4WhmRRs+YAZevLJ0wlqopZ8lMWCU2N7UWwddybM2TMvoHR6MtMS71pRgQ2Mr+X0Hen61.7D0DGSOig4z1MgcuYuOu.yBXplhcoDlWPgl3qHFX+2t2lpMwdej5LUovCiBDTJ7nUa4tV9kotPbSy84OP7nF9WWtuegGQs7umsOghmD9xW+B0ce4KdwdU26q180JWNRp48dyte0qdM7G9BIBbOLOq6OWM1SqTFhJJKjuIND2+uIfXj+vTdVGookupiAjGGGHczuT3l4WLsLDdDmk1HID135fFRvR.qx19DVtpd5StTWYHXJYU7Hj3o6mBjIo.Aet4Fe5Se5mXpcUXXuZg.mtj18bi4DKme76jM56se9LZjeAw6HmIvzn6tvOMh+5aa1Hidp+ikOFZdXd76FprJ7xCM+3eHAZT9qYfF+IeK0Z6VEcM5MUyhGVVBj004R4q2Osk0S+JnnxdtXXWFet3J42WeFjvJyFkmow7NYZVODHmLKOiw28Yb9SmKLOT7w6FJR+4P7kpG4XNyRmF+K0f84oDzAr0brOIB1m8fsGgtP9yW4yxmuw5B2mn1iPMFmMduWF3E1I4yMdC9XX1Vs0vgXCp.rOP8v+zm+u7EE+2A6H3XztDvIRs6rI8g7lFX.I17uFIHc48XYK8uuZX5y9XaS9M+DbEzYM18EB5rVXmJSzMbctvveOd1mayi3s.Xxl+UGso5Qr6Q0B2RWUsZkpJSHljKLLXTwy.rmsN6dGz4E2Ac16NnyKuC57p6fNu9NnyaVpNrO.q5ynNS7CSfF50hWZUgBsr0AuLtGox+ksZExz
                  

                  Hise Develop branch
                  MacOs 15.6.1, Xcode 16.2
                  http://musikboden.se

                  1 Reply Last reply Reply Quote 0
                  • Christoph HartC
                    Christoph Hart
                    last edited by

                    Jupp, valid request. Let me check how easy it is to implement...

                    ulrikU 1 Reply Last reply Reply Quote 2
                    • ustkU
                      ustk
                      last edited by ustk

                      I always wanted to do such a thing, but since it is not actually doable with panels I used object painting in one unique panel. Still very verbose to paint the object in a certain order but it is a viable solution...

                      Another situation where Z depth would be awesome is when you have multiple components you want to hide/show. Let say ADSR curves. If you want to see all of them but make one modifiable, it has to be on top of the others. The actual workaround is to make dummy curves behind, and only show the real component you want to modify... Well, it doesn't seem very clear once explained, but I assure you, it is clear in my head! 😛

                      Hise made me an F5 dude, any other app just suffers...

                      1 Reply Last reply Reply Quote 2
                      • ulrikU
                        ulrik @Christoph Hart
                        last edited by

                        @Christoph-Hart Great!

                        Hise Develop branch
                        MacOs 15.6.1, Xcode 16.2
                        http://musikboden.se

                        1 Reply Last reply Reply Quote 0
                        • Christoph HartC
                          Christoph Hart
                          last edited by

                          Alright, that was rather easy:

                          function mouseCallback(event)
                          {
                               if(event.clicked)
                                  this.setZLevel("AlwaysOnTop");
                          
                               if(event.mouseUp)
                                   this.setZLevel("Default");
                          };
                          

                          There are more advanced options ("Front" and "Back"), which you might want to use in certain occasions.

                          I also drive-by fixed a crash with your snippet (dragging around the panels made my system go boom).

                          ulrikU ustkU 3 Replies Last reply Reply Quote 3
                          • ulrikU
                            ulrik @Christoph Hart
                            last edited by

                            @Christoph-Hart Hallelujah! Thanks :)

                            Hise Develop branch
                            MacOs 15.6.1, Xcode 16.2
                            http://musikboden.se

                            1 Reply Last reply Reply Quote 0
                            • ustkU
                              ustk @Christoph Hart
                              last edited by ustk

                              @Christoph-Hart I'm testing, although the commit - fixed multithreading crash won't compile :

                              Untitled.png

                              Hise made me an F5 dude, any other app just suffers...

                              1 Reply Last reply Reply Quote 0
                              • ulrikU
                                ulrik @Christoph Hart
                                last edited by

                                @Christoph-Hart Error when compiling

                                Skärmavbild 2021-03-26 kl. 15.58.52.png

                                Hise Develop branch
                                MacOs 15.6.1, Xcode 16.2
                                http://musikboden.se

                                1 Reply Last reply Reply Quote 0
                                • Christoph HartC
                                  Christoph Hart
                                  last edited by

                                  Oopsies, little typo. It's fixed now.

                                  ulrikU 1 Reply Last reply Reply Quote 2
                                  • ulrikU
                                    ulrik @Christoph Hart
                                    last edited by ulrik

                                    @Christoph-Hart the setZLevel("Back") seems to behave a bit odd, when setting a childPanel with this once, it will become unreachable, the mouseCallback will no longer function.

                                    Is there more commands than this 4?
                                    I'm trying to sort 10 childPanels in Z and it seems impossible to do that with only this 4 commands.
                                    Is it possible to have an index system for z depth, or a way to set just 1 forward or 1 backward?

                                    And "Default", does it mean the order they where created, first created - deepest z, last created - on top?

                                    Hise Develop branch
                                    MacOs 15.6.1, Xcode 16.2
                                    http://musikboden.se

                                    ulrikU 1 Reply Last reply Reply Quote 0
                                    • ulrikU
                                      ulrik @ulrik
                                      last edited by

                                      @ulrik I saw in your commit there where this "numZLevels", is it already possible to set z-depth with numbers?

                                      Hise Develop branch
                                      MacOs 15.6.1, Xcode 16.2
                                      http://musikboden.se

                                      ulrikU 1 Reply Last reply Reply Quote 0
                                      • ulrikU
                                        ulrik @ulrik
                                        last edited by

                                        @ulrik ok, I tried but it wasn't

                                        Hise Develop branch
                                        MacOs 15.6.1, Xcode 16.2
                                        http://musikboden.se

                                        ulrikU 1 Reply Last reply Reply Quote 0
                                        • ulrikU
                                          ulrik @ulrik
                                          last edited by

                                          @ulrik I think the commands "Backward" & "Forward" would be great to have (1 step for each execursion)

                                          btw, thank you @Christoph-Hart for implementing this!

                                          Hise Develop branch
                                          MacOs 15.6.1, Xcode 16.2
                                          http://musikboden.se

                                          ulrikU 1 Reply Last reply Reply Quote 0
                                          • ulrikU
                                            ulrik @ulrik
                                            last edited by

                                            @ulrik I found this in Juce

                                            
                                            void 	toFront (bool shouldAlsoGainFocus)
                                             	Brings the component to the front of its siblings. 
                                             
                                            void 	toBack ()
                                             	Changes this component's z-order to be at the back of all its siblings. 
                                             
                                            void 	toBehind (Component *other)
                                             	Changes this component's z-order so that it's just behind another component. 
                                             
                                            void 	setAlwaysOnTop (bool shouldStayOnTop)
                                             	Sets whether the component should always be kept at the front of its siblings. 
                                             
                                            bool 	isAlwaysOnTop () const noexcept
                                             	Returns true if this component is set to always stay in front of its siblings. 
                                            
                                            

                                            I think the “toBehind” would be enough to handle several child panels

                                            Hise Develop branch
                                            MacOs 15.6.1, Xcode 16.2
                                            http://musikboden.se

                                            ulrikU 1 Reply Last reply Reply Quote 0
                                            • First post
                                              Last post

                                            12

                                            Online

                                            3.1k

                                            Users

                                            14.0k

                                            Topics

                                            122.1k

                                            Posts